Pittsburgh Steel proudly led the fabrication and erection of a multi-story office building in Mississauga, Ontario. The adoption of structural steel, driven by the project's aggressive schedule, facilitated concurrent site preparation, foundation work, and steel fabrication. This approach allowed for rapid delivery and erection of fabricated steel onsite, thereby enhancing productivity and accelerating the project timeline. Moreover, structural steel was selected for its environmental benefits—it is manufactured to precise specifications, minimizes onsite waste, and any residual waste is easily recyclable compared to other materials.